Jul 14 2026
RestaurantsMarilynn's PlaceThe Change Order Recipe

The Change Order Recipe

Inspired by Marilynn's Place
Time1h
Serves4

Fried catfish and shrimp, covered in our homemade hot sauce. and when we say “hot,” we mean it!

Was this page helpful?

Help improve this recipe for others.

Send this recipe to your inbox.

We'll email it straight to you - plus weekly cooking inspiration.

Ingredients

Some product links may be affiliates. If you buy through them, you're supporting the site and Pekin may earn a commission at no extra cost to you.

Fried Catfish and Shrimp

Method

Cooking Instructions

  1. 1

    Prepare the Marinade

    In a large bowl, soak the catfish fillets and shrimp in buttermilk for at least 30 minutes.

  2. 2

    Prepare the Coating

    In another bowl, combine cornmeal, flour, cayenne pepper, salt, and black pepper. Mix well.

  3. 3

    Heat the Oil

    In a large skillet or deep fryer, heat vegetable oil over medium-high heat until it reaches 350°F (175°C).

  4. 4

    Coat the Seafood

    Remove the catfish and shrimp from the buttermilk, letting excess drip off. Dip each piece into the cornmeal mixture, ensuring they are fully coated.

  5. 5

    Fry the Seafood

    Carefully place the coated catfish and shrimp into the hot oil. Fry in batches for about 4-5 minutes or until golden brown and crispy. Remove and drain on paper towels.

  6. 6

    Serve

    Serve the fried catfish and shrimp hot, drizzled generously with your favorite hot sauce.

More from Marilynn's Place